Search
Close this search box.
Search
Close this search box.

DPWH completes P184-M flood mitigation projects along Peñaranda River

Department of Public Works and Highways (DPWH) completed two flood mitigation projects along the Peñaranda River in the province of Nueva Ecija.

The infrastructures are located at barangay Rio Chico in General Tinio town and barangay Sinasajan in Peñaranda town.

𝐷𝑒𝑝𝑎𝑟𝑡𝑚𝑒𝑛𝑡 𝑜𝑓 𝑃𝑢𝑏𝑙𝑖𝑐 𝑊𝑜𝑟𝑘𝑠 𝑎𝑛𝑑 𝐻𝑖𝑔ℎ𝑤𝑎𝑦𝑠 𝑐𝑜𝑚𝑝𝑙𝑒𝑡𝑒𝑠 𝑎 𝑓𝑙𝑜𝑜𝑑 𝑚𝑖𝑡𝑖𝑔𝑎𝑡𝑖𝑜𝑛 𝑝𝑟𝑜𝑗𝑒𝑐𝑡 𝑎𝑙𝑜𝑛𝑔 𝑡ℎ𝑒 𝑆𝑖𝑛𝑎𝑠𝑎𝑗𝑎𝑛 𝑆𝑒𝑐𝑡𝑖𝑜𝑛 𝑜𝑓 𝑡ℎ𝑒 𝑃𝑒𝑛̃𝑎𝑟𝑎𝑛𝑑𝑎 𝑅𝑖𝑣𝑒𝑟 𝑖𝑛 𝑃𝑒𝑛̃𝑎𝑟𝑎𝑛𝑑𝑎 𝑅𝑖𝑣𝑒𝑟, 𝑁𝑢𝑒𝑣𝑎 𝐸𝑐𝑖𝑗𝑎. (𝐷𝑃𝑊𝐻)

DPWH Nueva Ecija 2nd District Engineer Elpidio Trinidad explained that the 0.994-kilometer flood wall structures were constructed with a steel sheet pile foundation.

It will manage erosion, reduce long-term flooding effects on nearby communities, and enhance the river’s water management system as the Peñaranda River merges into the Pampanga River leading to Manila Bay.

“These engineering measures are part of the District Engineering Office’s ongoing commitment to safeguarding communities and properties from inundation, especially during adverse weather conditions,” Trinidad pressed.

A total of P184 million was allotted for the projects under the 2023 General Appropriations Act. (PIA 3)

Share this post:

Leave a Reply

Your email address will not be published. Required fields are marked *