Search
Close this search box.
Search
Close this search box.

Tag: DPWH

National

Newly-widened arterial road bypass in Bulacan opens to motorists

The newly-widened arterial road bypass, which will reduce travel time from Balagtas to San Rafael in Bulacan to 24 minutes from the usual 69 minutes, is now open to motorists.

The Arterial Road Bypass Project (ARBP) Phase III, Contract Package 4 covers the construction of a 7.64-kilometer road, including a 36.86-meter single-span bridge and a 318-meter flyover.

Read More
Community

DPWH completes road rehab in Magalang

Department of Public Works and Highways (DPWH) completed a road rehabilitation project at barangay San Ildefonso in Magalang, Pampanga. The 788-meter, two-lane David Road underwent improvements to enhance accessibility and ensure safer travel by paving its 0.5-meter shoulders on each side, thereby widening it to six meters.

Read More
NEWS

DPWH completes flood control structure in Gabaldon

Department of Public Works and Highways (DPWH) completed the 846-lineal meter flood control structure in Gabaldon, Nueva Ecija. Situated along the barangay Bugnan section of the Coronel River, the project is expected to provide residents with protection as the town has been prone to flooding, especially during the monsoon season.

Read More
National

#TyphoonEgayUpdate

DPWH Bataan 1st District Engineering Office has taken action to address the aftermath of Typhoon Egay in Hermosa town

Read More