as of 31 July 2024, 1:00PM
Yellow Alert
ใฝ๏ธ2:00PM-4:00PM
ใฝ๏ธ5:00PM-10:00PM
Available Capacity – 12,969MW
Peak Demand – 11,768MW
ใฝ๏ธ7 plants have been on forced outage since January to May 2024, and 10 power plants between June and July 2024; while 5 are running on derated capacities, for a total of 3,017.9MW unavailable to the grid.
๐๐ฎ๐ฐ๐๐ผ๐ฟ๐ ๐๐ต๐ฎ๐ ๐ฐ๐ผ๐ป๐๐ฟ๐ถ๐ฏ๐๐๐ฒ๐ฑ ๐๐ผ ๐๐ต๐ฒ ๐ฟ๐ฎ๐ถ๐๐ถ๐ป๐ด ๐ผ๐ณ ๐๐ฒ๐น๐น๐ผ๐ ๐ฎ๐น๐ฒ๐ฟ๐:
- Sual U2 tripped at 7:41AM due to possible boiler tube leak.
- GNPD U2 will start to ramp down at 11:00AM and target emergency shutdown at 1:00PM, due to boiler tube leak.
The Visayas and Mindanao grids are under normal condition.
A ๐๐ฒ๐น๐น๐ผ๐ ๐ฎ๐น๐ฒ๐ฟ๐ is issued when the operating margin is insufficient to meet the transmission gridโs contingency requirement.