Search
Close this search box.
Search
Close this search box.

𝐒𝐨𝐥𝐚𝐫-𝐩𝐨𝐰𝐞𝐫𝐞𝐝 𝐰𝐚𝐭𝐞𝐫 𝐬𝐲𝐬𝐭𝐞𝐦 𝐢𝐧 𝐏𝐢𝐥𝐚𝐫

Department of Public Works and Highways (DPWH) completed a solar-powered water system project in Pilar, Bataan. The P9.5-million facility, located in barangay Panilao, was funded through the 2023 General Appropriations Act.

Bataan 2nd District Engineer Ulysses Llado said the project underscores DPWH’s commitment to an environmentally responsible future, enhancing water supply accessibility to people’s homes.

𝑇ℎ𝑒 𝐷𝑒𝑝𝑎𝑟𝑡𝑚𝑒𝑛𝑡 𝑜𝑓 𝑃𝑢𝑏𝑙𝑖𝑐 𝑊𝑜𝑟𝑘𝑠 𝑎𝑛𝑑 𝐻𝑖𝑔ℎ𝑤𝑎𝑦𝑠 𝑐𝑜𝑚𝑝𝑙𝑒𝑡𝑒𝑠 𝑎 𝑃9.5-𝑚𝑖𝑙𝑙𝑖𝑜𝑛 𝑠𝑜𝑙𝑎𝑟-𝑝𝑜𝑤𝑒𝑟𝑒𝑑 𝑤𝑎𝑡𝑒𝑟 𝑠𝑦𝑠𝑡𝑒𝑚 𝑝𝑟𝑜𝑗𝑒𝑐𝑡 𝑎𝑡 𝑏𝑎𝑟𝑎𝑛𝑔𝑎𝑦 𝑃𝑎𝑛𝑖𝑙𝑎𝑜 𝑖𝑛 𝑃𝑖𝑙𝑎𝑟, 𝐵𝑎𝑡𝑎𝑎𝑛. (DPWH)

“Ensuring an accessible and stable water supply for the local government units through the utilization of a solar-powered water system underscores our proactive approach in delivering essential services to the people,” he pressed.

Llado added that the use of solar power promotes renewable energy adoption, aiming to reduce costs and protect the environment.

It likewise serves as a beacon of hope for other municipalities grappling with similar challenges. (PIA 3)

Share this post:

Related Posts

Leave a Reply

Your email address will not be published. Required fields are marked *

Latest Posts