๐ƒ๐๐–๐‡ ๐œ๐จ๐ฆ๐ฉ๐ฅ๐ž๐ญ๐ž๐ฌ ๐๐Ÿ’๐Ÿ—-๐Œ ๐ฐ๐จ๐ซ๐ญ๐ก ๐จ๐Ÿ ๐ฉ๐ซ๐จ๐ฃ๐ž๐œ๐ญ๐ฌ ๐ข๐ง ๐Œ๐š๐ซ๐ข๐š ๐€๐ฎ๐ซ๐จ๐ซ๐š

Department of Public Works and Highways (DPWH) completed two projects in Maria Aurora, Aurora worth P49 million.

These include a 232.50-lineal meter flood control structure and improvement of a 1.9875-kilometer local road.

Department of Public Works and Highways completes improvement of a 1.9875-kilometer local road at barangay Detailen in Maria Aurora, Aurora. (DPWH)

DPWH Aurora District Engineer Roderick Andal said the P19.6-million flood control structure along Pacugao River in barangay Cabituculan East serves as a crucial protective measure safeguarding residents from potential inundation.

Moreover, construction of the P29.4-million road, including a lined canal, in barangay Detailen has significantly improved mobility for residents especially those engaged in coconut farming.

โ€œBoth projects play a vital role in providing the beneficiary barangays with much-needed improvements and enhanced resilience,โ€ Andal emphasized.

They were funded under the 2022 national budget and finished during the 1st quarter of this year. (PIA 3)

Share this post:

Leave a Reply

Your email address will not be published. Required fields are marked *