As of 22 October 2024/ 5:00PM
The following transmission lines have been energized:
LUZON
Pitogo-Mulanay 69kV Line
Date/Time Out: 22 October 2024 / 9:44AM
Date/Time In: 22 October 2024 / 1:43PM
Customer affected: QUEZELCO I
VISAYAS
Calbayog – Bliss 69kV Line
Date/Time Out: 22 October 2024 / 9:56AM
Date/Time In: 22 October 2024 / 2:31PM
Customer affected: SAMELCO I
The following transmission lines are unavailable:
LUZON
Daraga – Ligao 69kV Line
Date/Time Out: 22 October 2024/3:10PM
Customer affected: SORECO I, SORECO II
VISAYAS
Paranas – Quinapondan 69kV Line
Date/Time Out: 22 October 2024 / 12:55AM
Customer affected: ESAMELCO
Maasin – Baybay 69kV Line
Date/Time Out: 22 October 2024 / 1:07AM
Customer affected: LEYECO IV
Ormoc – San Isidro 69kV Line
Date/Time Out: 22 October 2024 / 9:38AM
Customer affected: BILECO, LEYECO III, DORELCO, LEYECO V
Calbayog – Allen 69kV Line
Date/Time Out: 22 October 2024 / 12:33PM
Customer affected: SAMELCO I, NORSAMELCO
Nasaug – San Isidro 69kV Line
Date/Time Out: 22 October 2024/12:35PM
Customer affected: SOLECO, DORELCO
NGCP has mobilized its line crews and is currently conducting patrols to inspect and assess the impact of the tropical storm to its operations and facilities. Simultaneous restoration activities are also being conducted in areas already accessible.
Please note that this update pertains only to the status of the transmission network. Localized disturbances may be better addressed by your distribution utility. This also does not include lines exclusively serving directly connected industrial customers.
Specific cities and municipalities affected by the unavailable transmission facility are determined by concerned Distribution Utilities, unless the outage affects the entire franchise area.