Search
Close this search box.
Search
Close this search box.

𝐋𝐔𝐙𝐎𝐍 𝐆𝐑𝐈𝐃 𝐀𝐋𝐄𝐑𝐓 𝐒𝐓𝐀𝐓𝐔𝐒 ⚠️

as of 𝟎𝟑 𝐉𝐮𝐧𝐞 𝟐𝟎𝟐𝟒, 𝟖:𝟎𝟎𝐀𝐌

𝐘𝐞𝐥𝐥𝐨𝐰 𝐀𝐥𝐞𝐫𝐭
〽️ 2:00PM-4:00PM
〽️ 7:ooPM-10:00PM

𝗔𝘃𝗮𝗶𝗹𝗮𝗯𝗹𝗲 𝗖𝗮𝗽𝗮𝗰𝗶𝘁𝘆 – 14,080MW
𝗣𝗲𝗮𝗸 𝗗𝗲𝗺𝗮𝗻𝗱 – 12,951MW

2 𝑝𝑙𝑎𝑛𝑡𝑠 ℎ𝑎𝑣𝑒 𝑏𝑒𝑒𝑛 𝑜𝑛 𝑓𝑜𝑟𝑐𝑒𝑑 𝑜𝑢𝑡𝑎𝑔𝑒 𝑠𝑖𝑛𝑐𝑒 2023, 2 𝑏𝑒𝑡𝑤𝑒𝑒𝑛 𝐽𝑎𝑛𝑢𝑎𝑟𝑦 𝑎𝑛𝑑 𝑀𝑎𝑟𝑐ℎ 2024, 𝑎𝑛𝑑 12 𝑝𝑜𝑤𝑒𝑟 𝑝𝑙𝑎𝑛𝑡𝑠 𝑏𝑒𝑡𝑤𝑒𝑒𝑛 𝐴𝑝𝑟𝑖𝑙 𝑎𝑛𝑑 𝑀𝑎𝑦 2024; 𝑤ℎ𝑖𝑙𝑒 6 𝑎𝑟𝑒 𝑟𝑢𝑛𝑛𝑖𝑛𝑔 𝑜𝑛 𝑑𝑒𝑟𝑎𝑡𝑒𝑑 𝑐𝑎𝑝𝑎𝑐𝑖𝑡𝑖𝑒𝑠, 𝑓𝑜𝑟 𝑎 𝑡𝑜𝑡𝑎𝑙 𝑜𝑓 2,692.8MW 𝑢𝑛𝑎𝑣𝑎𝑖𝑙𝑎𝑏𝑙𝑒 𝑡𝑜 𝑡ℎ𝑒 𝑔𝑟𝑖𝑑.

𝗙𝗮𝗰𝘁𝗼𝗿𝘀 𝘁𝗵𝗮𝘁 𝗰𝗼𝗻𝘁𝗿𝗶𝗯𝘂𝘁𝗲𝗱 𝘁𝗼 𝘁𝗵𝗲 𝗿𝗮𝗶𝘀𝗶𝗻𝗴 𝗼𝗳 𝘆𝗲𝗹𝗹𝗼𝘄 𝗮𝗹𝗲𝗿𝘁:
𝟏. Deration of Masinloc 1 (from 344MW to 180MW), Masinloc 2 (from 344MW to 320MW), Calaca 2 (from 300MW to 220MW), and Ilijan A from (600MW to 500MW)
𝟐. Unavailability of Angat Main (200MW) due to low water elevation
𝟑. Forced outage of the following plants: QPPL (460MW), Pagbilao 2 (382MW), and Sual 1 (647MW)

The Visayas and Mindanao grids are under normal condition.

A 𝗬𝗘𝗟𝗟𝗢𝗪 𝗔𝗟𝗘𝗥𝗧 is issued when the operating margin is insufficient to meet the transmission grid’s contingency requirement.

Related Posts

Leave a Reply

Your email address will not be published. Required fields are marked *

Latest Posts